Sales Automation Suite Blog

Tile Breakage in Transit: Claims Between Factory, Transporter and Dealer
Nishant Patel
11/16/2026
ERP

Tile Breakage in Transit: Claims Between Factory, Transporter and Dealer

Short answer: Tile breakage in transit is settled cleanly when the dealer counts boxes against the invoice on arrival, notes the breakage on the transporter's LR copy before the truck leaves, and sends the factory one complaint with photos, the invoice and the LR number the same day. The factory traces the truck and loading record, and the three sides agree on replacement, credit or a transporter claim, following terms agreed before any order.

Tiles travel by road from Morbi to Pune, Mumbai and the rest of Maharashtra, and some breakage is part of the trade. Disputes come from missing records, not from the breakage itself. For dispatch records, see tile dispatch tracking with LR numbers.

Why do tile breakage claims turn into disputes?

Because no one recorded the breakage at the moment it was found.

  • The truck left before boxes were counted.

  • Breakage was not written on the LR.

  • Photos were sent days later.

  • Nobody agreed in advance who pays.

How should tile breakage in transit be claimed?

Flow of a tile breakage claim: count boxes, note on the LR, record a complaint, trace the truck, and close with replacement or credit

Five steps, the same day.

  1. Count boxes against the invoice.

  2. Note breakage on the LR copy, signed by the driver.

  3. Record one complaint with photos, invoice and LR number.

  4. Trace the truck and loading record at the factory.

  5. Close with replacement, credit or a transporter claim.

Who does what in a tile breakage claim?

Table of who does what in a tile breakage claim: dealer, factory, transporter, and all three agreeing a settlement
  • Dealer: counts, notes on LR, takes photos.

  • Factory: traces truck, invoice and loading.

  • Transporter: acknowledges breakage on the LR.

  • All three: agree replacement, credit or claim.

How can factories reduce tile breakage in transit?

Start with loading and packing. Record who loaded each truck and how, keep box pack stock apart, and track breakage by transporter and route so you can see where it happens most.

How does Sales Automation Suite help with breakage claims?

Sales Automation Suite (SAS) from Peanut Square is one ERP and CRM built for how India sells. It is meant for Indian B2B sellers who outgrow a CRM-only stack: India lead portals and WhatsApp are on the pricing page, the price is in rupees, and it runs on Cloud or On-Premise.

The SAS tile industry page lists SAS Delivery LR Transport, which keeps the LR number and transport name on delivery orders. In the SAS Ceramic Stock screens shared by Nishant Patel on 19 Oct 2026 (customer details hidden), Less Stock entries record each exit with dealer, city, invoice number and truck number, and PackBox Stock keeps box pack entries in their own list. The SAS knowledge base covers the complaint dashboard, which shows complaints by status and dates.

Our guides on tile shade variation complaints and ceramic CRM for samples, complaints and follow-ups cover the complaint flow.

On price: ₹300/user/month on Premium (40% off ₹500, GST extra, billed yearly).

SAS is built by Peanut Square in Ahmedabad, Gujarat. The SAS tile industry page lists ISO 9001:2015 and ISO 27001:2022.

To see it with your own process: Book a free demo at sas.peanutsquare.com

How should tile breakage in transit be claimed and settled?

Count boxes on arrival, note breakage on the LR before the truck leaves, send one complaint with photos, invoice and LR the same day, and settle by replacement, credit or a transporter claim as agreed.

Why must breakage be noted on the LR?

The LR is the transporter's receipt. A note on it, signed by the driver, is the dealer's proof that the breakage happened in transit.

Who pays for tile breakage in transit?

It depends on the terms agreed between factory and dealer, and on the transporter's terms. Agree them in writing before the first order.

How can a factory find where breakage happens?

Track breakage claims by transporter, route and loading team over a few months.

Does SAS record the LR number on deliveries?

Yes. The SAS tile page lists SAS Delivery LR Transport, which keeps the LR number and transport name on delivery orders.